Day 3 dawned as both clear and cold.  Work continued on two houses with drywall compound and taping efforts at both places.  Additional activities at one site  included general site cleanup, pressure washing the basement, and setting out much construction debris for trash pickup.  An effort was made to clean the sump pump basin and we were able to get the garage door opener to work again.   Sanding and second coats of drywall compound are next at both locations.   

 

 

 

 

 

 

Progress has been very good for the last three days.  So much so that the group will be split into smaller teams on Thursday and tackle two more locations.  One is a house that needs underlayment for new flooring and the other is one that needs substantial cleanup.  Another possibility is installing basement windows in a third home. 

 

FPCJC folks provided dinner for us this evening and invited us to join them in worship.